St. Margaret Mary Master Plan
Client
St. Margaret Mary PTO
Design Team
Booker Design Collaborative
Status
Master Plan completed in 2019
BDC worked with the St. Margaret Mary School Parent Teacher Organization, staff, and faculty to create a campus master plan that included an enlarged sports field complex, new concessions and ticketing, a STEAM courtyard for outdoor learning, and a campus fitness loop with stations of the cross. The already quite fully developed state of the campus necessitated that new features be folded into the existing landscape. Thus, the sports complex fields overlap to work within the available space, the STEAM courtyard is located within a building cove that is visible from within the building classrooms, and the walking trail at times utilizes the existing driveway area.